Project Description
After insulating the walls they were lined with a combination of Trusscore on the walls as well as a fibreglass coated plywood. The ceiling was insulated and lined with a pvc liner panel . This shop was fitted with two sinks and a cleaning station. Centreline co-ordinated the In-floor heat, boiler and propane furnace installs as well as electrical throughout.